{"version":"0.1","company":{"name":"YubHub","url":"https://yubhub.co","jobsUrl":"https://yubhub.co/jobs/skill/schedule-risk"},"x-facet":{"type":"skill","slug":"schedule-risk","display":"Schedule Risk","count":1},"x-feed-size-limit":100,"x-feed-sort":"enriched_at desc","x-feed-notice":"This feed contains at most 100 jobs (the most recently enriched). For the full corpus, use the paginated /stats/by-facet endpoint or /search.","x-generator":"yubhub-xml-generator","x-rights":"Free to redistribute with attribution: \"Data by YubHub (https://yubhub.co)\"","x-schema":"Each entry in `jobs` follows https://schema.org/JobPosting. YubHub-native raw fields carry `x-` prefix.","jobs":[{"@context":"https://schema.org","@type":"JobPosting","identifier":{"@type":"PropertyValue","name":"YubHub","value":"job_76c9a01c-58a"},"title":"Data Center Portfolio Planning & Execution Lead","description":"<p>We&#39;re looking for a Data Center Portfolio Planning &amp; Execution Lead to drive the planning and framework that ensures every site moves smoothly from the front-end phases through design, construction, equipment delivery, commissioning, and operational readiness.</p>\n<p>This role owns the portfolio-level operating system: translating capacity supply pipeline into integrated project plans that span every phase of delivery, building the tooling and automation that runs it at scale, and maintaining Anthropic&#39;s datacenter capacity catalog , a lifecycle view of our fleet that supports both execution orchestration and steady-state capacity planning.</p>\n<p>Responsibilities:</p>\n<ul>\n<li>Manage the integrated master plan for each site across the portfolio , stitching power ramp, design, construction, sourcing, deployment, and operations readiness into a single coordinated schedule with clear milestones and dependencies</li>\n<li>Develop and maintain Anthropic&#39;s datacenter catalog for deployed and in-progress capacity. Manage the portfolio-level view of physical infrastructure &amp; cluster interfaces across all sites and partners to enable planning decisions such as equipment fungibility, accelerator platforms, tech insertion, or workload allocation</li>\n<li>Define and run the stage gates and decision locks for cluster delivery , from lease execution to design lock through procurement, construction, equipment installation, commissioning, and handover</li>\n<li>Drive gate reviews, manage exceptions, and track the downstream impact of deviations across the portfolio</li>\n<li>Manage portfolio reviews and risk tracking for DC Infra leadership and Compute Supply</li>\n</ul>\n<p>Tooling &amp; process:</p>\n<ul>\n<li>Develop tooling and automation to enable cross-functional planning flow-down from datacenter capacity availability dates</li>\n<li>Partner with Design, Supply Chain, Construction, and DC Ops program leads to drive cross-pillar process improvements as portfolio scales</li>\n</ul>\n<p>You may be a good fit if you:</p>\n<ul>\n<li>Are familiar with the full datacenter buildout lifecycle: pipeline → design → sourcing → construction → Cx → deployment</li>\n<li>Have run integrated portfolio or master-schedule planning across a fleet of capital projects (datacenter, energy, fab, or similar) where multiple functional orgs each own a phase</li>\n<li>Have built a stage-gate or decision-lock system from scratch and gotten functional leads to adopt it</li>\n<li>Have re-architected a deployment or delivery process at scale and can point to the cycle-time or throughput result</li>\n<li>Build the tooling yourself using AI-assisted development , stand up planning dashboards, schedule automation, and data pipelines from Smartsheet/P6/partner systems</li>\n<li>Proactively surface schedule risk across functions , comfortable flagging a problem in someone else&#39;s domain before it becomes a slip</li>\n<li>Track record of driving outcomes through influence with cross-functional partners</li>\n</ul>\n<p>Strong candidates may also have:</p>\n<ul>\n<li>Experience building a portfolio planning and execution function from scratch at a hyperscaler or large industrial owner</li>\n<li>Exposure to capacity planning or S&amp;OP processes that connect demand forecast to physical build</li>\n<li>Experience product-managing internal planning, workflow, or scheduling systems</li>\n</ul>\n<p>The annual compensation range for this role is $365,000-$485,000 USD.</p>\n<p style=\"margin-top:24px;font-size:13px;color:#666;\">XML job scraping automation by <a href=\"https://yubhub.co\">YubHub</a></p>","url":"https://yubhub.co/jobs/job_76c9a01c-58a","directApply":true,"hiringOrganization":{"@type":"Organization","name":"Anthropic","sameAs":"https://www.anthropic.com","logo":"https://logos.yubhub.co/anthropic.com.png"},"x-apply-url":"https://job-boards.greenhouse.io/anthropic/jobs/5188939008","x-work-arrangement":"hybrid","x-experience-level":"senior","x-job-type":"full-time","x-salary-range":"$365,000-$485,000 USD","x-skills-required":["data center portfolio planning","execution lead","portfolio-level operating system","capacity supply pipeline","integrated project plans","tooling and automation","datacenter capacity catalog","lifecycle view of fleet","execution orchestration","steady-state capacity planning","stage gates","decision locks","cluster delivery","lease execution","design lock","procurement","construction","equipment installation","commissioning","handover","cross-functional planning","flow-down","datacenter capacity availability dates","cross-pillar process improvements","AI-assisted development","planning dashboards","schedule automation","data pipelines","Smartsheet","P6","partner systems","schedule risk","cross-functional partners","portfolio planning","execution function","hyperscaler","large industrial owner","capacity planning","S&OP processes","demand forecast","physical build","internal planning","workflow","scheduling systems"],"x-skills-preferred":[],"datePosted":"2026-04-18T15:59:03.702Z","jobLocation":{"@type":"Place","address":{"@type":"PostalAddress","addressLocality":"Remote-Friendly, United States"}},"jobLocationType":"TELECOMMUTE","employmentType":"FULL_TIME","occupationalCategory":"Engineering","industry":"Technology","skills":"data center portfolio planning, execution lead, portfolio-level operating system, capacity supply pipeline, integrated project plans, tooling and automation, datacenter capacity catalog, lifecycle view of fleet, execution orchestration, steady-state capacity planning, stage gates, decision locks, cluster delivery, lease execution, design lock, procurement, construction, equipment installation, commissioning, handover, cross-functional planning, flow-down, datacenter capacity availability dates, cross-pillar process improvements, AI-assisted development, planning dashboards, schedule automation, data pipelines, Smartsheet, P6, partner systems, schedule risk, cross-functional partners, portfolio planning, execution function, hyperscaler, large industrial owner, capacity planning, S&OP processes, demand forecast, physical build, internal planning, workflow, scheduling systems","baseSalary":{"@type":"MonetaryAmount","currency":"USD","value":{"@type":"QuantitativeValue","minValue":365000,"maxValue":485000,"unitText":"YEAR"}}}]}