{"version":"0.1","company":{"name":"YubHub","url":"https://yubhub.co","jobsUrl":"https://yubhub.co/jobs/skill/project-timeline-management"},"x-facet":{"type":"skill","slug":"project-timeline-management","display":"Project Timeline Management","count":2},"x-feed-size-limit":100,"x-feed-sort":"enriched_at desc","x-feed-notice":"This feed contains at most 100 jobs (the most recently enriched). For the full corpus, use the paginated /stats/by-facet endpoint or /search.","x-generator":"yubhub-xml-generator","x-rights":"Free to redistribute with attribution: \"Data by YubHub (https://yubhub.co)\"","x-schema":"Each entry in `jobs` follows https://schema.org/JobPosting. YubHub-native raw fields carry `x-` prefix.","jobs":[{"@context":"https://schema.org","@type":"JobPosting","identifier":{"@type":"PropertyValue","name":"YubHub","value":"job_34c23f04-f57"},"title":"Program Body Leader","description":"<p><strong>Job Description</strong></p>\n<p>This position is within VME-BODY AND STAMPING-USA Organization. The role will be a Body Leader – Implementation (focused position classified as Program Implementation Supervisor). This role supports major milestones from <SC> through Job 1 + Acceleration with key focus on Implementation and Launch of Tooling, Facilities and Sheetmetal Systems.</p>\n<p><strong>Responsibilities</strong></p>\n<ul>\n<li>Lead Team of Core Manufacturing Engineers in Planning / Execution phases of new model program(s)</li>\n<li>Accelerates process needs into overall strategy plan to support Plant requirements, integrate teams for collaboration and track open issue resolution</li>\n<li>Deliver Body Facility, Tooling and Quality Systems and Launch new model programs</li>\n</ul>\n<p><strong>Safety</strong></p>\n<ul>\n<li>No safety or ergonomic red issues</li>\n<li>Protag process adhered to including but not limited to ECPL Placarding complete, signed-off and in place. Led and achieve Protag pink and yellow for tooling, on time and on first attempt. Ensure protag completion to support build/installation timing.</li>\n<li>Drive safety through weekly discussion with launch support team</li>\n<li>Eliminate all level 9 and 10 severity PFMEA issues</li>\n<li>Ensure safety and ergo sign-off at 100% Design and tooling buy-off (Assembly Ergonomic Tooling (MHS) Checklist; VOSS 1.6.3)</li>\n<li>Ensure no LTCR for construction and no serious injuries at all plants.</li>\n<li>Complete pre-task risk assessments prior to tool and facility installs.</li>\n<li>Resolve all ergonomics issues prior to PP.</li>\n<li>Assess and drive compliance for all safety and ergonomics DPA checks.</li>\n<li>Ensure tool designs address all safety and ergonomic issues</li>\n<li>Obtain signoff of ergonomics evidence book for tool buyoff</li>\n</ul>\n<p><strong>Quality</strong></p>\n<ul>\n<li>Mandatory compliance, Manage Y(C&#39;s) including all torques and mandatory compliance designations that are released in WERS are documented in GSPAS and process accounted for</li>\n<li>Complete torque tracking matrix - will begin at 50% Design --&gt; Tooling readiness, Copy of the VBS for fasteners</li>\n<li>Achieve 90% Flash Free Minimum in Steel Welding applications</li>\n<li>Ensure tooling, at 100% design &amp; tooling buy-off, follows LD files. If changes are required, generate WLRR</li>\n<li>Ensure DPA checklists are correctly pulled for New Model Programs</li>\n<li>Drive processes, tooling and product designs to prevent deviations to GMR’s &amp; VOSS. If unable to resolve, generate and obtain deviation approval</li>\n<li>Manage Hem Feasibility during DPA in conjunction with PF Development at UPV1, 2 and P-release</li>\n<li>Ensure weld guns and rivet guns are properly evaluated in DPA and will deliver to requirements.</li>\n<li>Process requirements are accurately stated in SOW</li>\n<li>Quality maturation plan of Process Tooling equipment will meet program objectives</li>\n<li>Complete all VTTO quality metrics, including tooling repeatability study</li>\n<li>PF Changes which impact design, utilize change control (i.e., generate WLRR)</li>\n<li>Manage, via prioritization matrix, Dimensional requirements at each build phase</li>\n<li>Ensure weld guns and rivet guns are properly set-up and delivering to requirements.</li>\n<li>Process requirements are accurately stated in GSPAS and on VBS</li>\n<li>No campaigns for any closure manufacturing related item</li>\n<li>Ensure Body Tooling Processes are meeting vehicle requirements (Pp/PpK, Surface, Sealing)</li>\n</ul>\n<p><strong>Delivery</strong></p>\n<ul>\n<li>Ensure DPA, Tooling SOW’s are released to schedule. Follow up on PO placements.</li>\n<li>Create and update GSPAS sheets; manage direct labor authorization for closure manufacturing</li>\n<li>Provide simulation inputs and optimize layout to support Total Plant Layout.</li>\n<li>Generate VTTO VRF for tooling buy-off requirements; reduce quantities were applicable</li>\n<li>Drive processes, tooling and product designs to prevent deviations to GMR’s &amp; VOSS. If unable to resolve, generate and obtain deviation approval</li>\n<li>Verify achievement of throughput targets for each system with Simulation Engineer</li>\n<li>PFMEA&#39;s reviewed, updated and delivered according to schedule (initial and final)</li>\n<li>Deliver tooling, facilities, and processes to achieve new product launch timing, Mfg Projects and acceleration curves in support of 100% OKTB Deliverables</li>\n<li>Manage VIM and Project Timeline with VIS/Launch Leader, Coordinate VTTO for buy off event</li>\n<li>Complete customer check sheet, tooling repeatability study &amp; cycle time verification</li>\n<li>Tooling buy-off is completed, on time and on first attempt; zero exceptions and customer checklist complete; Support disposition of all 8D&#39;s and clearly document supplier agreements for OK to ship tooling &amp; facilities</li>\n<li>Completion of BCE exit book at MP2 - ensure tooling meets throughput requirements (tooling achieve NET JPH for 10 shifts) via FIS</li>\n<li>Verify achievement of throughput targets for each sub-system using Factory Information System (or equivalent) data. If targets not achieved, 8D required to address repetitive issues significantly affecting throughput. Evidence of throughput can be obtained by reviewing the last two consecutive weeks of data (FIS if available). The average JPH (units produced/actual worked hours) produced by each subsystem and ship to paint must meet or exceed the targets established through simulation.</li>\n<li>Verify that all Cycle Times (with parts) for new/kitted cells or combination of cells (line) are at design intent cycle time using FIS (Report 011 - Cycletime) over 10 shifts (or equivalent) using average cycletime, per station per model. Also all stations must have no more than 10% of their overall cycles over station ERC during 10 shifts (source FIS Report 011 - Cycletime).</li>\n<li>FIS Validation process complete and all issues closed; reference FIS Checklist</li>\n<li>Manage Post <A> Layout changes including updated 1A, validated to ensure the documentation matches the tooling on the floor.</li>\n</ul>\n<p><strong>Cost</strong></p>\n<ul>\n<li>Support Planning with cost studies and presentations. Develop all programs within approved F&amp;T funding levels. Meet or exceed all program budget objectives.</li>\n<li>Help to develop LLF&#39;s request, inputs to costing sheets, work on plan to meet targets.</li>\n<li>Complete all workstation cycle line layouts by <A>.</li>\n<li>Drive VOME BCE/IE alignment at each study phase to ensure all direct and indirect labor (e.g. quality, weld teardown, maintenance, etc.) is captured including current state.</li>\n<li>Contain manufacturing-driven WERS changes to less than $250,000 and 0 labor add for total program.</li>\n<li>Achieve Investment Efficiency target of 1.5% for 2017 and update BOG.</li>\n<li>Formulate and estimate New Model Program layout, flexibility, cycle time, cost, facility and labor targets at required Milestones</li>\n<li>Review and understand SOW and supplier quotes. Look for discrepancies or non-value added costs</li>\n<li>Save 10% of costs, over BCE’s advance program study group</li>\n<li>Manage financial cost tracking and TWM for Total Program</li>\n<li>Reconcile sup</li>\n</ul>\n<p style=\"margin-top:24px;font-size:13px;color:#666;\">XML job scraping automation by <a href=\"https://yubhub.co\">YubHub</a></p>","url":"https://yubhub.co/jobs/job_34c23f04-f57","directApply":true,"hiringOrganization":{"@type":"Organization","name":"VME-BODY AND STAMPING-USA Organization","sameAs":"https://corporate.ford.com/","logo":"https://logos.yubhub.co/corporate.ford.com.png"},"x-apply-url":"https://efds.fa.em5.oraclecloud.com/hcmUI/CandidateExperience/en/sites/CX_1/job/61837?utm_source=yubhub.co&utm_medium=jobs_feed&utm_campaign=apply","x-work-arrangement":"hybrid","x-experience-level":"senior","x-job-type":"full-time","x-salary-range":"Not Stated","x-skills-required":["Manufacturing Engineering","Process Improvement","Project Management","Quality Assurance","Safety Management","Tooling Design","Welding","Riveting","Dimensional Measurement","Cycle Time Optimization","Factory Information System (FIS)","Total Plant Layout","Vitality Index Management (VIM)","Project Timeline Management","Customer Check Sheet","Tooling Repeatability Study","Cycle Time Verification","BCE Exit Book","FIS Validation","Post-A Layout Changes","VOME BCE/IE Alignment","Manufacturing-Driven WERS Changes","Investment Efficiency Target","New Model Program Layout","Flexibility","Cycle Time","Cost","Facility","Labor Targets","SOW and Supplier Quotes","Discrepancies","Non-Value Added Costs","Financial Cost Tracking","TWM for Total Program"],"x-skills-preferred":[],"datePosted":"2026-04-25T12:13:58.864Z","jobLocation":{"@type":"Place","address":{"@type":"PostalAddress","addressLocality":"Dearborn"}},"employmentType":"FULL_TIME","occupationalCategory":"Engineering","industry":"Automotive","skills":"Manufacturing Engineering, Process Improvement, Project Management, Quality Assurance, Safety Management, Tooling Design, Welding, Riveting, Dimensional Measurement, Cycle Time Optimization, Factory Information System (FIS), Total Plant Layout, Vitality Index Management (VIM), Project Timeline Management, Customer Check Sheet, Tooling Repeatability Study, Cycle Time Verification, BCE Exit Book, FIS Validation, Post-A Layout Changes, VOME BCE/IE Alignment, Manufacturing-Driven WERS Changes, Investment Efficiency Target, New Model Program Layout, Flexibility, Cycle Time, Cost, Facility, Labor Targets, SOW and Supplier Quotes, Discrepancies, Non-Value Added Costs, Financial Cost Tracking, TWM for Total Program"},{"@context":"https://schema.org","@type":"JobPosting","identifier":{"@type":"PropertyValue","name":"YubHub","value":"job_f0a2268b-adf"},"title":"Mechanical Design Engineer, Manufacturing","description":"<p>As our team continues to quickly grow, we are looking for motivated candidates that are inspired to work within an extremely energetic, creative, and innovative team that is passionate about subsea robotics and exploring the open ocean.</p>\n<p>We work in a highly dynamic environment where collaboration and idea sharing are a way of life. We are seeking a Mechanical Design Engineer to join our Manufacturing Engineer Team, working in a cutting-edge start-up environment to advance the state-of-the-possible in factory, equipment, and process execution.</p>\n<p>This is an ideal role for an individual with broad experience and passion for mechanical design and design for manufacturing. The ideal candidate will seek continuous improvement opportunities in both the physical and data space, gaining broad experience within an advanced production environment by designing production fixtures to help the technicians execute build processes efficiently as well as working closely with manufacturing and design engineers to improve product manufacturability.</p>\n<p>The Mechanical Design Engineer will be responsible for owning the physical design, prototyping, and fabrication of production equipment, developing novel tooling solutions for fabrication and assembly of structural parts, performing detailed mechanical designs, selecting appropriate materials, executing engineering calculations, performing FEA simulations, and designing and developing mechanical test equipment.</p>\n<p>In addition, the Mechanical Design Engineer will be responsible for effectively coordinating their effort to support the Production team with mechanical design of fixtures/equipment, selecting and managing suppliers, overseeing physical assembly and commissioning of designed systems, diagnosing and resolving production issues, and supporting the broader Production team by creating and maintaining designs in our PLM (Teamcenter).</p>\n<p>Safety and compliance: Ensure all processes adhere to safety regulations and company policies.</p>\n<p>Designing manufacturing jigs and fixtures capturing design updates, modifications, and improvements to existing manufacturing equipment and aids (including load testing requirements and prescription).</p>\n<p>Required qualifications include a BS, M.Eng, or MS in Mechanical Engineering or a related field, professional experience working as a Mechanical Engineer with one or more domains and/or technologies of expertise, 5+ years of experience in a relevant engineering field, preferably mechanical design for manufacturing, demonstrated ability to manage projects from concept to completion, strong skills in NX for 3D modeling and 2D drawing creation, proficiency with FEA in NX, FEMAP, or ANSYS, personal experience with physical assembly and commissioning, proficiency in engineering calculations and material selection, proficiency with engineering standards and GD&amp;T, ability to manage suppliers and project timelines effectively, and ability to obtain and maintain an Australian NV2 Security clearance.</p>\n<p>Preferred qualifications include experience with NX/Teamcenter, experience in the design and development of tooling, jigs, and fixtures, experience in production support within an advanced manufacturing organization, understanding of load testing and prescription for mechanical fixtures, and knowledge of corrosion prevention techniques.</p>\n<p style=\"margin-top:24px;font-size:13px;color:#666;\">XML job scraping automation by <a href=\"https://yubhub.co\">YubHub</a></p>","url":"https://yubhub.co/jobs/job_f0a2268b-adf","directApply":true,"hiringOrganization":{"@type":"Organization","name":"Anduril Industries","sameAs":"https://www.andurilindustries.com/","logo":"https://logos.yubhub.co/andurilindustries.com.png"},"x-apply-url":"https://job-boards.greenhouse.io/andurilindustries/jobs/5074430007?utm_source=yubhub.co&utm_medium=jobs_feed&utm_campaign=apply","x-work-arrangement":"onsite","x-experience-level":"senior","x-job-type":"full-time","x-salary-range":null,"x-skills-required":["NX","FEA","Mechanical Design","Design for Manufacturing","Material Selection","Engineering Calculations","GD&T","Supplier Management","Project Timeline Management"],"x-skills-preferred":["NX/Teamcenter","Tooling, Jigs, and Fixtures","Production Support","Load Testing and Prescription","Corrosion Prevention Techniques"],"datePosted":"2026-04-24T15:17:58.677Z","jobLocation":{"@type":"Place","address":{"@type":"PostalAddress","addressLocality":"Sydney, New South Wales, Australia"}},"employmentType":"FULL_TIME","occupationalCategory":"Engineering","industry":"Technology","skills":"NX, FEA, Mechanical Design, Design for Manufacturing, Material Selection, Engineering Calculations, GD&T, Supplier Management, Project Timeline Management, NX/Teamcenter, Tooling, Jigs, and Fixtures, Production Support, Load Testing and Prescription, Corrosion Prevention Techniques"}]}