{"version":"0.1","company":{"name":"YubHub","url":"https://yubhub.co","jobsUrl":"https://yubhub.co/jobs/skill/procurement-of-long-lead-electrical-equipment"},"x-facet":{"type":"skill","slug":"procurement-of-long-lead-electrical-equipment","display":"procurement of long-lead electrical equipment","count":1},"x-feed-size-limit":100,"x-feed-sort":"enriched_at desc","x-feed-notice":"This feed contains at most 100 jobs (the most recently enriched). For the full corpus, use the paginated /stats/by-facet endpoint or /search.","x-generator":"yubhub-xml-generator","x-rights":"Free to redistribute with attribution: \"Data by YubHub (https://yubhub.co)\"","x-schema":"Each entry in `jobs` follows https://schema.org/JobPosting. YubHub-native raw fields carry `x-` prefix.","jobs":[{"@context":"https://schema.org","@type":"JobPosting","identifier":{"@type":"PropertyValue","name":"YubHub","value":"job_f9d36c77-0a6"},"title":"Staff, Energy Operations","description":"<p>The Staff, Energy Operations role is a senior position within CoreWeave&#39;s Data Center Development organization. This position is responsible for owning the site-level utilities path required to advance data center developments from early diligence through development readiness, construction alignment, and delivery to Operations.</p>\n<p>Key responsibilities include:</p>\n<ul>\n<li>Owning site-specific power feasibility and validation for all Development opportunities.</li>\n<li>Serving as a hard Development gate - no site advances without a confirmed, executable utilities path.</li>\n<li>Validating availability, delivery timelines, upgrade requirements, costs, and risk profiles.</li>\n</ul>\n<p>The role also involves:</p>\n<ul>\n<li>Actively coordinating with utility providers to drive overall utility coordination, design reviews, infrastructure planning, development budgeting to turn over execution.</li>\n<li>Holding utilities and external partners accountable to agreed delivery schedules and milestones.</li>\n<li>Supporting on-the-ground engagement internal and external teams with utilities, municipalities, and local stakeholders.</li>\n</ul>\n<p>Additionally, the role requires:</p>\n<ul>\n<li>Analyzing alternative power structures where required to accelerate delivery or mitigate risk.</li>\n<li>Translating alternative power paths into a clear schedule, cost, and execution impacts for Development decision-making.</li>\n</ul>\n<p>This role serves as the connective tissue across Development, Operations, Finance, Legal, Gov/Tax, Sustainability, Design, and Construction, ensuring power costs, timelines, and risks are accurately reflected in Development schedules, TCO and financial models, and executive-level materials supporting go/no-go decisions.</p>\n<p>The Staff, Energy Operations role supports construction and operational readiness but does not own construction execution.</p>\n<p style=\"margin-top:24px;font-size:13px;color:#666;\">XML job scraping automation by <a href=\"https://yubhub.co\">YubHub</a></p>","url":"https://yubhub.co/jobs/job_f9d36c77-0a6","directApply":true,"hiringOrganization":{"@type":"Organization","name":"CoreWeave","sameAs":"https://www.coreweave.com","logo":"https://logos.yubhub.co/coreweave.com.png"},"x-apply-url":"https://job-boards.greenhouse.io/coreweave/jobs/4660515006?utm_source=yubhub.co&utm_medium=jobs_feed&utm_campaign=apply","x-work-arrangement":"onsite","x-experience-level":"senior","x-job-type":"full-time","x-salary-range":null,"x-skills-required":["power feasibility","utility coordination","design reviews","infrastructure planning","development budgeting","alternative power structures","project management"],"x-skills-preferred":["construction scheduling","procurement of long-lead electrical equipment","practical constructability assessments","joint venture frameworks","capital-partner development models"],"datePosted":"2026-04-18T15:50:44.175Z","jobLocation":{"@type":"Place","address":{"@type":"PostalAddress","addressLocality":"Livingston, NJ / New York, NY / Sunnyvale, CA / Bellevue, WA / Richmond, VA"}},"employmentType":"FULL_TIME","occupationalCategory":"Engineering","industry":"Technology","skills":"power feasibility, utility coordination, design reviews, infrastructure planning, development budgeting, alternative power structures, project management, construction scheduling, procurement of long-lead electrical equipment, practical constructability assessments, joint venture frameworks, capital-partner development models"}]}